Fellowship Church and Phillipsburg Christian Academy Icon
  Search For:

   How to be Saved
  Phillipsburg
  Christian Academy
   Overview
   Alumni
   Art Fair
   Brochure
   Calendar
   Dress Code
   Faculty & Staff
   Honor Roll
   Map Location
   Photo Gallery
   Registration Forms
   RenWeb Login
   Science Fair
   Sports
   Summer Enrichment
   8 Bridge Projects

PayPal - The safer, easier way to pay online!
securely via PayPal

Phillipsburg Christian Academy Heading

Whatever you do, do your work heartily, as for the Lord rather than for men; Colossians 3:23

Fellowship Church Fellowship Church Phillipsburg Christian Academy Phillipsburg Christian Academy


8th Grade Bridge Project

Since 2005, we have replaced this activity with the West Point Bridge Designer, v4 software, which allows students to design and test bridge configurations on the computer.

Specifications:
Bridge length = 24 +/- 1 centimeters
Chasm width = 22 +/- 1 centimeters
Material: spaghetti, cardboard plates and Elmer's glue
Balsa wood roadway: 5 centimeters wide x 25 centimeters long
Sand is added to a bucket suspended from the roadway until either the bridge deflects 1 cm from horizontal or until the bridge collapses.

2004 Bridges

First Place
Engineer: Mark
Materials Manager: Luke
Accountant: Tysson

Held: 4868 grams (10.7 lbs.)
Bridge Mass: 48.3 grams
Ratio: 101:1

First Place Bridge Photo

Second Place
Engineer: Anthony
Materials Manager: Daniel
Accountant: Anthony

Held: 4155 grams (9.1 lbs.)
Bridge Mass: 43 grams
Ratio: 97:1

Second Place Bridge Photo

Third Place
Engineer: Kim
Materials Manager: Brittany
Accountant: Melissa

Held: 3653 grams (8.0 lbs.)
Bridge Mass: 42.4 grams
Ratio: 86:1

Third Place Bridge Photo


2003 Bridges

First Place
Engineer: Christopher
Materials: Samuel & Donald
Accountant: Timothy

Held: 4930 grams (10.8 lbs.)
Bridge Mass: 36.1 grams
Ratio: 137:1

First Place Bridge Photo

Second Place
Engineer: Heather
Materials Manager: Melanie
Accountant: Melanie

Held: 4517 grams (9.9 lbs.)
Bridge Mass: 35.8 grams
Ratio: 126:1

Second Place Bridge Photo

Third Place
Engineers: Amy & Elya
Materials Manager: Amy
Accountant: Elya

Held: 2296 grams (5.1 lbs.)
Bridge Mass: 21.4 grams
Ratio: 107:1

Third Place Bridge Photo

2002 Bridges

First Place
Engineer: Olivia
Materials Manager: Amy
Accountant: Amy

Weight Supported
= 6.1 pounds
19.5 spaghetti lengths

Olivia & Amy Bridge Photo

Second Place
Engineer: Kyle
Materials Manager: Andy
Accountant: Andy

Weight Supported
= 6.3 pounds
35 spaghetti lengths

Kyle & Andy Bridge Photo


to support this ministry via PayPal.


300 Cromwell Street, Phillipsburg, New Jersey 08865
Voice: 908-859-6464 Fax: 908-213-0619 E-mail: pcadmin@verizon.net


Top of Page | Home Page | Site Map | Contact Us